In addition to working ont the walls, we needed to prepair for electric. We wanted underground lines, so we had to dig a trench from the power pole to the house. Gilbert rented a ditch witch and went to town.
Gilbert also worked under the house on the puzzel called waste plumbing. Here is a great picture of what he built.
Tom and me installing a door...
Tom and me building interior walls...
That's all for now, I have to get some sleep.
Click here for the next page